<sup id="jedrd"></sup><small id="jedrd"><acronym id="jedrd"></acronym></small>

    <sup id="jedrd"></sup>

    <ins id="jedrd"><option id="jedrd"><optgroup id="jedrd"></optgroup></option></ins>

      <ins id="jedrd"><video id="jedrd"><var id="jedrd"></var></video></ins>
    1. <ins id="jedrd"><acronym id="jedrd"><optgroup id="jedrd"></optgroup></acronym></ins><ruby id="jedrd"><option id="jedrd"></option></ruby>

      product thumbnail

      項目案例
      (Reference)

      “Further Evolved “Ubiquity on the Road” With faster, more accurate information, LSIS’ high-tech freeway traffic management system facilitates safe driving and efficient communication on the freeway.

      • Main Line
      • Metro Line
      • 下載
      • 客戶支持

      Main Line

      Kyungbu High Speed Railway

      • - HSR Signalling System
          Consortium Leader[Phase 2 of Kyungbu HSR Project
          Automatic Train Control System[ATC, Onbroad & Wayside Systems]
          Train Traffic Management System[TMS]
          System Engineering
          Safety Facilities
      • - HSR Phase 2 CTC Implementation
           Localized and Implemented CTC for HSR Phase 2
           Primary Backup Railway traffic Control Centers
      • - HSR Electrical System

      Reference-s1.jpg

      Metro Line

      Seoul Metro Phase 1 Line 3 & 4

      • - CTC, Control Facility
      • - Electrical Power System Facility:
          7 DC Substation (Line 3)
          5 DC Substation (Line 4)

      Reference-s2.jpg

      Seoul Metro Phase 2 Line 6

      • - CTC, Control Facility
      • - Signalling
      • - Electrical Power System Facility: 12 DC Substation

      Reference-s3.jpg

      Line 7 & 8

      • - CTC, Control Facility
      • - Electrical Power System Facility: 11 DC Substation

      Reference-s4.jpg

      Busan Line 1 & 2

      • - Signalling, TTC, ATC, Simulation System

      Reference-s5.jpg

      Incheon Line 1

      • - Electrical Power System Facility: 10 DC Substation

      Reference-s6.jpg

      Daegu Line 1 & 2

      • - Electrical Power System Facility: 10 DC Substation (Line 1) 9 + 1 DC Substation (Line 2, Extension)

      Reference-s7.jpg

      LRT

      Incheon International Airport Shuttle Train

      E&M Work

      • - Supply / Installation and Operation / Maintenance of IAT (Intra Airport Transit
      • - System as a Consortium Leader
      • - Managed Consortium Project Control, System Integration, Operation and Maintenance Between 03.11~Now
      • - LSIS Delivered and Performed
          Electrical Power System(AC SWGR, DC SWGR, Rectifier, SCADA, Etc.)
          Communication System
          Platform Screen Doors
          1st Unmanned LRT in Korea

      Incheon Line 2

      E&M Consortium

      • - 12 Substations
      • - 6 Energy Storages
      • - SCADA
      • - Electric Work
      • - 27 stations. PSD

      Gwangmyoung

      E&M Works

      • - LSIS will fabricate, purchase and deliver all mechanical, electrical and automation systems
      • - Except for civil / architectural works
      • - R/S, electrical power facilities, signalling, communication system, PSD and catenary system, etc.
      • - Sub-system engineering services to implement independent systems & Integration
      • - Providing total engineering services for train operation system.

      Overseas

      Thailand ST1 & ST4

      • - ST1 Signaling & Communication System
           CTC : 52 Station
           CIC: 14 Station
           Block System: 14 Sets
           Level crossing: 32 Sets
           Switch: 127 Sets
           Track Circuit: 150 Sets
           Signaling Device: 342 Sets
      • - ST4 Signaling & Communication System
           CTC : 7 Station
           CBI: 7 Station ( LS-EIS520V)
           Block System: 7 Sets
           Communication System: 7 Sets
           Switch: 92 Sets
           Track Circuit: 357 Sets
           Signaling Device: 131 Sets
           Power Supply: 7 Sets

      Reference-s8.jpg

      Main Line

      Kyungbu High Speed Railway

      • - HSR Signalling System
          Consortium Leader[Phase 2 of Kyungbu HSR Project
          Automatic Train Control System[ATC, Onbroad & Wayside Systems]
          Train Traffic Management System[TMS]
          System Engineering
          Safety Facilities
      • - HSR Phase 2 CTC Implementation
           Localized and Implemented CTC for HSR Phase 2
           Primary Backup Railway traffic Control Centers
      • - HSR Electrical System

      Reference-s1.jpg

      Metro Line

      Seoul Metro Phase 1 Line 3 & 4

      • - CTC, Control Facility
      • - Electrical Power System Facility:
          7 DC Substation (Line 3)
          5 DC Substation (Line 4)

      Reference-s2.jpg

      Seoul Metro Phase 2 Line 6

      • - CTC, Control Facility
      • - Signalling
      • - Electrical Power System Facility: 12 DC Substation

      Reference-s3.jpg

      Line 7 & 8

      • - CTC, Control Facility
      • - Electrical Power System Facility: 11 DC Substation

      Reference-s4.jpg

      Busan Line 1 & 2

      • - Signalling, TTC, ATC, Simulation System

      Reference-s5.jpg

      Incheon Line 1

      • - Electrical Power System Facility: 10 DC Substation

      Reference-s6.jpg

      Daegu Line 1 & 2

      • - Electrical Power System Facility: 10 DC Substation (Line 1) 9 + 1 DC Substation (Line 2, Extension)

      Reference-s7.jpg

      LRT

      Incheon International Airport Shuttle Train

      E&M Work

      • - Supply / Installation and Operation / Maintenance of IAT (Intra Airport Transit
      • - System as a Consortium Leader
      • - Managed Consortium Project Control, System Integration, Operation and Maintenance Between 03.11~Now
      • - LSIS Delivered and Performed
          Electrical Power System(AC SWGR, DC SWGR, Rectifier, SCADA, Etc.)
          Communication System
          Platform Screen Doors
          1st Unmanned LRT in Korea

      Incheon Line 2

      E&M Consortium

      • - 12 Substations
      • - 6 Energy Storages
      • - SCADA
      • - Electric Work
      • - 27 stations. PSD

      Gwangmyoung

      E&M Works

      • - LSIS will fabricate, purchase and deliver all mechanical, electrical and automation systems
      • - Except for civil / architectural works
      • - R/S, electrical power facilities, signalling, communication system, PSD and catenary system, etc.
      • - Sub-system engineering services to implement independent systems & Integration
      • - Providing total engineering services for train operation system.

      Overseas

      Thailand ST1 & ST4

      • - ST1 Signaling & Communication System
           CTC : 52 Station
           CIC: 14 Station
           Block System: 14 Sets
           Level crossing: 32 Sets
           Switch: 127 Sets
           Track Circuit: 150 Sets
           Signaling Device: 342 Sets
      • - ST4 Signaling & Communication System
           CTC : 7 Station
           CBI: 7 Station ( LS-EIS520V)
           Block System: 7 Sets
           Communication System: 7 Sets
           Switch: 92 Sets
           Track Circuit: 357 Sets
           Signaling Device: 131 Sets
           Power Supply: 7 Sets

      Reference-s8.jpg

      下載

      主題 分類 語言 修改日期

      客戶支持

      常見問題 more
      聯系我們 more
      top